2011-RS07

Joint Confidence Level of a Parametric Software Cost and Schedule Estimate Risk Track RS07A_Paper_JCLofParametricSoftwareCostandSchedEst_Ross RS07_JCLofParametricSoftwareCostandSchedEst_Ross Abstract: This paper summarizes a

Continue reading

2011-RS05

Risk Based Estimating and Alternative Selection Using Value Analysis Risk Track RS05_Presentation_RiskBaseEstimatingandAltSelectionValueAnalysis_Brink Abstract: The selection between project alternatives and corresponding

Continue reading

2011-RS03

Covered with Oil: Incorporating Realism in Cost Risk Analysis Risk Track RS03A_Paper_CoveredwOiRealisminCostRiskAnalysis_Smart RS03_Presentation_CoveredwOilRealisminCostRiskAnalysis_Smart Abstract: When Jimmy Buffett sang the words

Continue reading

2011-RE07

Enhancing Cost Realism Through Risk-Driven Contracting: Designing Incentive Fees Based on Probabilistic Cost Estimates Research Track RE07A_Paper_CostRealistmThruRiskDrivenContracts_Dorey RE07_Presentation_EnhancingCostRealismThroughRiskDrivenContracting_Dorey Abstract: Cost

Continue reading