2012-RSK08

Real Data, Real Uncertainty Risk Track RSK08_Presentation_RealDataRealUncertainty_Smith Abstract: Central to any cost risk analysis and model are the uncertainty distributions assigned to point estimates. Ideally, the analyst will have a […]

2012-RSK06

Enhanced Scenario-Based Method for Cost Risk Analysis: Theory, Application, and Implementation Risk Track RSK06_Update_eSBM for Cost Risk Analysis_Theory_Application_Implementation RSK06_Presentation_EnhancedScenarioBasedMethodforCostRiskAnalysis_Flynn RSK06_Paper_EnhancedScenarioBasedMethodofCostRiskAnalysis_Flynn Abstract: There is a growing realization within the cost-analysis community […]

2012-RSK05

SAR Data Analysis, CV Benchmarks, and the Updated NCCA S-Curve Tool Risk Track RSK05_Presentation_SARDataAnalysisCVBenchmarksandUpdatedNCCASCurveTool_Lee Abstract: To support the development of better probabilistic cost estimates, the Naval Center for Cost Analysis […]

2012-RSK04

A Systematic Approach for Empirical Sensitivity Analysis on Monte Carlo Models Risk Track RSK04_Presentation_SystematicApproachforEmpiricalSensitivityAnalysisonMonteCarloCost_Pitlyk Abstract: A key component of risk analysis is the sensitivity analysis performed on the input variables […]

2012-RSK03

Fitting Absolute Distributions to Limited Data Risk Track RSK03_Presentation_FittingAbsoluteDisttoLimitedData_Boswell Abstract: The choice of probability distributions is a critical component for cost risk and uncertainty modeling. When data is available, distribution […]

2012-RSK02

Using Method of Moments in Schedule Risk Analysis Risk Track RSK02_Paper_MethodofMomentsinScheduleRiskAnalysis_Covert RSK02_Presentation_UsingMethodofMomentsinSchedRiskAnalysis_Covert Abstract: A program schedule is a critical tool of program management. Program schedules based on discrete estimates of […]

2012-PAR13

Applying Parametric Cost Models as a Predictive Parameter for CMMI Compliance Parametrics Track PAR13_Presentation_ApplyingParametricCostModelsasaPredictiveParameterforCMMICompliance_Bloom Abstract: The Electronic Engineering Center (EEC) of Raytheon Space and Airborne Systems (SAS) recently breezed through […]

2012-PAR12

Introducing Reliability and Availability Requirements into TOC Models Parametrics Track PAR12_Presentation_IntroducingReliabilityandAvailabilityRequirementsintoTOCModels_Lee PAR12_Paper_IntroducingReliabillityandAvailabilityRequirementsintoTOCModels_Lee Abstract: Two important system requirements are reliability and availability. Reliability is the probability of no disabling failures over […]

2012-PAR11

Understanding and Measuring the Impact of Design and Systems Engineering Decisions on Affordability Parametrics Track PAR11_Presentation_UnderstandingMeasuringImpactofDesignandSysEngineeringDecisionsonAffordability_Jasnoff Abstract: Methodologies for understanding and measuring the impact of design and systems engineering decisions […]

2012-PAR08

Tactical Missile Bluebook and Cost Model Overview Parametrics Track PAR08_Presentation_TacticalMissileBluebookandCostModelOverview_Covert Abstract: MCR recently developed the Tactical Missile Bluebook together with a cost model based on the information contained in it. […]